IPA Slovakia, s.r.o. workshop: Systematic procedure for reducing work
The role of the regulator in addition to measuring time is finding a way to reduce it. Part of the operations is a waste that does not add value and we want to eliminate it in the process. Reserves are found in the construction of the product, the material used, the working procedure, the used technology and tools or the layout of the workplace.